Water Construction Standards, Rates and Fees
Construction Standards
The Water Construction Standards are updated periodically as necessary. The last update was published in January of 2025.
The current version is available below:
Water Construction Standards February 2026
Below is a list of the standards that were updated in February of 2026:
Current Water Rates & Fees
Water Connection Fees
Meter Size |
Fee |
|---|---|
5/8 x 3/4 inch meter service |
$ 2,036 |
3/4 inch meter service |
$ 2,105 |
1 inch meter service |
$ 2,262 |
1 - 1/2 inch meter service |
Actual Cost |
2 inch meter service |
Actual Cost |
3 inch meter service |
Actual Cost |
4 inch meter service |
Actual Cost |
6 inch meter service |
Actual Cost |
Residential Facilities Fee
$2.33 per square foot of living space
Fee Effective on January 1, 2026
Meter Box Fees
Meter Box Upgrade Fee for Box Not Previously Upgraded - $995
Meter Box Fee for Box Previously Upgraded - $249
Upgrade of Existing Water Meter - Customer pays the difference in current costs of Connection Fee for existing meter size and the new meter size, plus the meter box upgrade fee, if applicable.
Commercial Facilities Fees
Meter Size (inches) |
EDU |
Fees effective on January 1, 2025 |
|---|---|---|
5/8 x 3/4 |
1 |
$ 6,373 |
3/4 |
1.5 |
$ 9,563 |
1 |
2.5 |
$ 15,936 |
11/2 |
5 |
$ 31,874 |
2 |
8 |
$ 50,999 |
3 |
15 |
$ 95,620 |
4 |
25 |
$ 159,366 |
6 |
50 |
$ 318,731 |